Description
The project consisted on a preliminary study of structural type for the bridge crossing the Wadi Mughsail. In a second stage the loading demand was defined with site specific studies including wind, seismic and Tsunami load. The project was therefore presented for the administration through complete Tener documents and associated render architectural views.
Client
Detonator Blasting & Contracting Co. for Ministry of Housing and Urban Planning
Location
Governorate of Dhofar – Salalah – Oman
Service
Concept Design
Year
2018
Nuestros proyectos

Preliminary design of a Cable Stayed Bridge in Mughsail Village in Dhofar Governorate – Sultanate of Oman
The project consisted on a preliminary study of structural type for the bridge crossing the Wadi Mughsail.

Detail design of a concrete Hydraulic protection structure of Infrastructure at Monsoon Affected Areas
The scope of this work is to improve the discharge flow performances of Wadi Sathan by introducing a structure able to increase the width of its bed.

Wind Farm Ferrandina – WTG foundation detail design (32 MW) Ferrandina, Salandra e Garguso (MT)– Basilicata – Italy
In this project the foundation for 5 WTG were developed for the wind farm labeled as Ferrandina. The total installed power is expected to be 32 MW using 5 x V162 turbines